Skip to content
No Second Trip

Material calculators for real building projects

Work out how much material to order — and see exactly how the number was reached. Every formula, density and assumption is shown on the page.

Browse the calculators
Worked exampleAsphalt Calculator

A 40 ft × 12 ft driveway (480 sq ft) surfaced with 2 in of standard hot-mix asphalt, with the default 5% waste allowance. Area × thickness gives 80 cu ft, which becomes 84 cu ft with waste. At 145 lb/ft³ that is 12,180 lb.

Result

6.09 tons of asphalt

Calculators

How these work

The formula is on the page

Every calculator shows its arithmetic step by step, so you can follow how your dimensions became a number and check it against your own.

Every constant is sourced

Material densities, coverage rates and code minimums are listed with their typical range and where they came from. No unexplained numbers.

Built for a phone in a store aisle

Numeric keypads, large targets, results without scrolling, and no ads or pop-ups above the calculator.

By project